Custom Home Feasibility in Redmond, WA
A feasibility study identifies the regulatory, environmental, and site-specific factors that determine what can be built on a property in Redmond. Redmond’s zoning code, sensitive area regulations, and stormwater requirements can significantly influence custom home design. Our feasibility analysis for Redmond includes:
Zoning, allowable uses, and development standards (RZC – Redmond Zoning Code)
Required setbacks, height limits, and lot coverage
Critical areas (steep slopes, erosion hazards, wetlands, streams, riparian zones, floodplains)
Shoreline management requirements near Lake Sammamish and major streams
Tree protection and significant tree retention rules
Sewer, water, and utility availability (City of Redmond + PSE)
Preliminary stormwater requirements under the Redmond Stormwater Technical Notebook
Access requirements, fire apparatus standards, and driveway slope limits
High-level grading and overall site suitability
Our feasibility reports outline buildability and provide a clear path toward Redmond permit approval.
Civil Engineering for Custom Home Sites in Redmond
Once feasibility confirms development potential, we provide complete civil engineering services tailored to Redmond’s review standards. This includes:
Site plans meeting Redmond Development Services submittal requirements
Grading plans with cut/fill analysis, slope evaluation, and retaining wall needs
Stormwater design (infiltration feasibility, flow control, water quality, and dispersion systems)
Coordination of infiltration testing and soil evaluation
Driveway design and slope compliance
Utility design for sewer, water, and power routing
Erosion and sediment control plans
Earthwork calculations
Right-of-way improvements when required by Redmond Public Works
Construction documents prepared for full permit review
Our plans comply with Land Use Code requirements and support the architectural and structural design teams.
Permit Management & Project Coordination in Redmond
Redmond’s review process typically involves Planning, Public Works, Stormwater Engineering, and Fire. We manage the process to maintain predictable timelines:
Preparing complete permit application packages
Responding to correction comments and technical requests
Coordinating with surveyors, geotechnical engineers, arborists, architects, and builders
Monitoring review timelines and required resubmittals
Ensuring compliance with Redmond Zoning Code and Stormwater Technical Notebook
This reduces administrative delays during the pre-construction phase.
Common Redmond-Specific Constraints
Streams, Riparian Buffers & Wetlands
Many areas—including Education Hill, Idylwood, and neighborhoods near Bear Creek—contain regulated buffers requiring careful site planning.
Tree Retention Requirements
Redmond enforces significant tree preservation rules that may affect building placement and grading.
Stormwater Requirements
Depending on soils, Redmond may require infiltration systems, flow control, or enhanced water quality treatment.
Steep Slopes & Geologic Constraints
Some parcels include slopes or erosion hazards that require geotechnical evaluation.
Right-of-Way Improvements
Frontage improvements may be triggered by project scope and roadway classification.
Identifying these conditions early prevents redesigns and unexpected cost impacts.
Start Your Redmond Custom Home Feasibility Review
A successful custom home project begins with accurate information and a clear understanding of Redmond’s regulations. McInnis Engineering provides feasibility studies, civil engineering, and permit management to support homeowners and builders throughout the permitting process.
Contact us to begin a feasibility assessment or discuss your Redmond property.